Bring the analysis brief
A material name alone may not establish temperature-dependent properties or a constitutive model. A picture of a fixture may not show its actual compliance. Identify these gaps before treating the setup as complete.
Translate a test protocol
Turn a test brief into a setup plan
Inspect the applied setup
For each region, request its name and measured location or extent. Verify load directions and total magnitudes, coordinate systems, contact behavior, and the consistency of units.Check the applied boundary conditions